top of page
2011-2012 KMS Construction Water Project
Implementation of new water services into existing houses dealing with individual owners
2013 James Smith Cree Nation Water Project
New water line installation and cathodic protection on steel apparatus.
2017-2018 Town of Creighton
Installation of 1600m of 6'' and 8'' HDPE raw water line
2015 SPARC Water Pipeline
New water line installation and cathodic protection on steel apparatus.
2017-2018 Town of Esterhazy
Sewage Force main by directional boring. Installation 2100m of 450mm, 400mm, and 350mm HDPE waterline by directional boring and open cut. Including Installation of valves and fire hydrants.
2017-2018 R.M. of Sherwood
Installation 2100m of 450mm, 400mm, and 350mm HDPE waterline by directional boring and open cut. Including Installation of valves and fire hydrants.
2017-2018 SaskPower Chinook Water line
Installation of 18km of 6'' waterline by directional bore
bottom of page