2011-2012 KMS Construction Water Project

Implementation of new water services into existing houses dealing with individual owners

2013 James Smith Cree Nation Water Project

New water line installation and cathodic protection on steel apparatus.

2017-2018 Town of Creighton

Installation of 1600m of 6'' and 8'' HDPE raw water line

2015 SPARC Water Pipeline

New water line installation and cathodic protection on steel apparatus.

2017-2018 Town of Esterhazy

Sewage Force main by directional boring. Installation 2100m of 450mm, 400mm, and 350mm HDPE waterline by directional boring and open cut. Including Installation of valves and fire hydrants. 

2017-2018 R.M. of Sherwood

Installation 2100m of 450mm, 400mm, and 350mm HDPE waterline by directional boring and open cut. Including Installation of valves and fire hydrants. 

2017-2018 SaskPower Chinook Water line

Installation of 18km of 6'' waterline by directional bore

2019-2020 Balgonie Force Sewer Main and Lift Station

Installation of 800m of 10'' HDPE, with grading. Directional Drilling under hwy #1, and installation of lift station tanks.